Starting Batteries Regeneration
Plug and Play...

DOWMLOAD PDF FILE
Connecting Procedure
1- Preparartion of the batteries on line on the trolleys.
2- Plug in
the two main plots with the crossing line.
3- Plug in the main
distribution line.
4- Starting the regenerator.
5- Ammeter control
on each line.

